欢迎来到报告吧! | 帮助中心 分享价值,成长自我!

报告吧

换一换
首页 报告吧 > 资源分类 > PDF文档下载
 

通过系统规模规划改善水电成果:一个来自缅甸的例子(英文版).pdf

  • 资源ID:90287       资源大小:36MB        全文页数:68页
  • 资源格式: PDF        下载积分:15金币 【人民币15元】
快捷下载 游客一键下载
会员登录下载
三方登录下载: 微信开放平台登录 QQ登录  
下载资源需要15金币 【人民币15元】
邮箱/手机:
温馨提示:
用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)
支付方式: 支付宝    微信支付   
验证码:   换一换

加入VIP,下载共享资源
 
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,既可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

通过系统规模规划改善水电成果:一个来自缅甸的例子(英文版).pdf

Improving Hydropower Outcomes Through System-Scale Planning: An Example from Myanmar Report prepared for United Kingdoms Department for International Development (DFID) by The Nature Conservancy, WWF and The University of Manchester2 SYSTEM-SCALE PLANNING: MYANMAR 2016 This report was prepared for the United Kingdoms Department for International Development (DFID) by The Nature Conservancy (TNC), World Wide Fund for Nature (WWF) and The University of Manchester with support from Myanmar Institute for Integrated Development (MIID), CGIARs Program on Water, Land investment costs; flood control; navigation; displaced people; forest loss; fishery support; fish biodiversity; and sediment load. We examined multiple portfolios that represent different combinations of dams and operational rules. Each portfolio was quantified in terms of performance across all 10 metrics with outcomes simulated over 50 years. To illustrate that some metrics cannot be accurately measured at the scale of a sub-basin such as the Myitnge (e.g., the movement of migratory fish throughout a larger basin), some additional analyses were conducted at the scale of the entire Irrawaddy basin. MAP 2. Current existing, under construction and planned dams in the Myitnge River basin8 SYSTEM-SCALE PLANNING: MYANMAR 2016 The results illustrated that some interests are compatible with each other but, for other interests, there are clear trade-offs. The results, and associated visualizations, can allow decision-makers and stakeholders to discuss and negotiate alternative development scenarios. The results and visualizations can also identify portfolios which will allow a better balance among a set of interests. For example, as generally expected, a larger number of dams in the Myitnge sub-basin causes increased fragmentation, sediment and nutrient trapping, and flow alteration, thus reducing the sub-basins contribution to the overall fishery support in the Irrawaddy basin. However, there are several combinations of dams and operating rules that produce almost the same amount of energy, but with much lower impacts on fishery support (Figure 1). This study was focused more on demonstrating the potential for a system-scale approach to improve decision making rather than trying to inform specific decisions for the Myitnge. The results from the Myitnge analysis do illustrate the benefits of a system-scale approach to planning hydropower. The analyses show that different development pathways will have large differences in performance across important interests and that some of these differences and opportunities can only be detected by looking at the system scale, rather than by evaluating projects one-by-one. The products of a system-scale approach can identify trade-offs to be discussed and negotiated in a rational and constructive process and point toward win-win solutions. Using a system-scale planning approach would allow Myanmar to carefully choose which investments it wants to prioritize in order to achieve portfolios that provide a more balanced or desirable range of benefits. FIGURE 1. Trade-off between support for fisheries and mean annual hydropower generation Myanmar has the opportunity to carefully choose which investments it wants to prioritize in order to achieve portfolios that provide a more balanced or desirable range of benefits. PHOTO: © Justin Blethrow Trade-off between support for fisheries and mean annual hydropower generation. Each point shows the performance achieved by a combination of infrastructure investments and their operating rules.

注意事项

本文(通过系统规模规划改善水电成果:一个来自缅甸的例子(英文版).pdf)为本站会员(大风降温)主动上传,报告吧仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知报告吧(点击联系客服),我们立即给予删除!

温馨提示:如果因为网速或其他原因下载失败请重新下载,重复下载不扣分。




关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

copyright@ 2017-2022 报告吧 版权所有
经营许可证编号:宁ICP备17002310号 | 增值电信业务经营许可证编号:宁B2-20200018  | 宁公网安备64010602000642号


收起
展开